Skip to content

Conversation

@jupierce
Copy link
Contributor

No description provided.

@stbenjam
Copy link
Member

/lgtm

@openshift-ci openshift-ci bot added the lgtm Indicates that a PR is ready to be merged. label Oct 23, 2025
@openshift-ci
Copy link
Contributor

openshift-ci bot commented Oct 23, 2025

[APPROVALNOTIFIER] This PR is APPROVED

This pull-request has been approved by: jupierce, stbenjam

The full list of commands accepted by this bot can be found here.

The pull request process is described here

Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@openshift-ci openshift-ci bot added the approved Indicates a PR has been approved by an approver from all required OWNERS files. label Oct 23, 2025
@jupierce jupierce changed the title Fixing and investigating flakes during overlapping test execution NO-ISSUE: Fixing and investigating flakes during overlapping test execution Oct 23, 2025
@openshift-ci-robot openshift-ci-robot added the jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. label Oct 23, 2025
@openshift-ci-robot
Copy link

@jupierce: This pull request explicitly references no jira issue.

In response to this:

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the openshift-eng/jira-lifecycle-plugin repository.

@jupierce
Copy link
Contributor Author

/verified by e2e testing

@openshift-ci-robot openshift-ci-robot added the verified Signifies that the PR passed pre-merge verification criteria label Oct 23, 2025
@openshift-ci-robot
Copy link

@jupierce: This PR has been marked as verified by e2e testing.

In response to this:

/verified by e2e testing

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the openshift-eng/jira-lifecycle-plugin repository.

@openshift-ci-robot
Copy link

/retest-required

Remaining retests: 0 against base HEAD d629cf1 and 2 for PR HEAD 2dae51e in total

@openshift-ci-robot
Copy link

/retest-required

Remaining retests: 0 against base HEAD 450d258 and 1 for PR HEAD 2dae51e in total

@openshift-ci
Copy link
Contributor

openshift-ci bot commented Oct 24, 2025

@jupierce: The following test failed, say /retest to rerun all failed tests or /retest-required to rerun all mandatory failed tests:

Test name Commit Details Required Rerun command
ci/prow/okd-scos-e2e-aws-ovn 2dae51e link false /test okd-scos-e2e-aws-ovn

Full PR test history. Your PR dashboard.

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the kubernetes-sigs/prow repository. I understand the commands that are listed here.

@openshift-ci-robot
Copy link

/retest-required

Remaining retests: 0 against base HEAD 367ab40 and 0 for PR HEAD 2dae51e in total

@openshift-merge-bot openshift-merge-bot bot merged commit 8941163 into openshift:main Oct 24, 2025
18 of 21 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lgtm Indicates that a PR is ready to be merged. verified Signifies that the PR passed pre-merge verification criteria

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants